ALL Inspectors are available by appointment ONLY
POLE BARN FORM For Drawing
click here
Residential Deck Requirements
Deck Requirements Sheet for Residential Decks
Building Permit
click here
Mechanical Permit
click here
Plumbing Permit
click here
Electrical Permit
click here (excel version)
Click here (pdf version)
Building Inspection Department
Bunkerhill Township
Ingham County, Michigan
**THERE IS A $300 FINE FOR STARTING A PROJECT WITHOUT A PERMIT**
The following must be presented before a building permit is issued
Building Permits are NOT issued until Plan Review has been Approved by Inspector
Any construction that is permanently fastened to ground or another building REQUIRES a permit. Be it further resolved that it is the responsibility of the builder to obtain ALL permits prior to the start of construction.
- BUILDING INSPECTOR: Bill Myers : (517) 910-3370
- PLUMBING INSPECTOR: Tim Basore: (517) 623-6257
- MECHANICAL INSPECTOR: Tim Basore: (517) 623-6257
- ELECTRICAL INSPECTOR: Matt Wood: (517) 569-2003
POLE BARN FORM For Drawing
click here
Residential Deck Requirements
Deck Requirements Sheet for Residential Decks
Building Permit
click here
Mechanical Permit
click here
Plumbing Permit
click here
Electrical Permit
click here (excel version)
Click here (pdf version)
Building Inspection Department
Bunkerhill Township
Ingham County, Michigan
**THERE IS A $300 FINE FOR STARTING A PROJECT WITHOUT A PERMIT**
The following must be presented before a building permit is issued
Building Permits are NOT issued until Plan Review has been Approved by Inspector
- Soil erosion permit :Drain Commissioner: 517-676-8395
- Driveway permit (if new build or adding new drive) :Road Commission: 517-676-9722
- Health Dept well and septic permit :Health Dept: 517-887-4311
- http://hd.ingham.org/Home/EnvironmentalHealth/WellandSeptic.aspx
- Plot plan showing all lot lines and set-back measurements/Property Staked
- 2 complete sets of blue prints (Township keeps 1)
- Res-Check Compliance Cert: www.energycodes.gov
- The building permit fee
- Plan Review Approved by Inspector
Any construction that is permanently fastened to ground or another building REQUIRES a permit. Be it further resolved that it is the responsibility of the builder to obtain ALL permits prior to the start of construction.